CHINA SCOTON OILFIELD EQUIPMENT CO., LTD.

The Launch of New Production Optimization Platform

Weatherford International released the ForeSite production optimization platform at its software conference. The new platform combines physical model and advanced data analysis to comprehensively improve the performance of wellhead, reservoir and water facilities. This release is the first in the company's integrated software product line. The series combines production optimization with the Internet of things, cloud computing and advanced analytics to achieve full asset management. The platform is currently focused on improving the management of the well management of the pump lifting system, which will then be extended to all lifting modes, as well as the management and optimization of oil reservoirs and water facilities.
Related Article
  • The RAR Technology Provides a New Function for the Disconnectable Mooring System

    The RAR Technology Provides a New Function for the Disconnectable Mooring System

    September 22, 2017Delmar recently launched a new RAR Plus and move-max deliverable mooring system. The RAR Plus technology adds new key features to the 35-year old RAR technology, such as manual release, and it raises ...view
  • Usage & Operation of Safety Joints

    Usage & Operation of Safety Joints

    April 29, 2018(I) Drill stringassemblySafetyjoint installs on the tubing string and operates for drilling, salvaging, wellcleaning, repairing and testing, etc. Its diameter and diameter of the bit portshould be th...view
  • Dual Well Completion Principle

    Dual Well Completion Principle

    April 29, 2018After the oil wellpenetrating through the oil layer and the bottom water layer, the well completionsare implemented in oil and water layer, and the two layers were seperated by apacker. When the well ...view
  • The New Hose Connector Reduces the Stress of the Hose

    The New Hose Connector Reduces the Stress of the Hose

    September 22, 2017KLAW recently launched Marine2, which is 32 percent shorter and 25 percent lighter than the traditional offshore pulled joint. The design is designed to reduce the stress on the hose at sea. The short...view
  • Maintenance of Mud Pump

    Maintenance of Mud Pump

    April 27, 20181. The mud pump must be installed on a relatively stable foundation. Before operation, carefully check the lubrication condition, fastening condition, and fit clearances between various parts of the ...view
  • Multilateral Drilling

    Multilateral Drilling

    March 29, 2021Sometimes oil and natural gas reserves are located in separate layers underground and multilateral drilling allows producers to branch out from the main well to tap reserves at different depths.This i...view
  • TEL:+86-029-81138812
  • FAX:+86-029-62827812
  • EMAIL:sales@scotonpetro.com
  • ADDRESS:Hi-Tech Development zone, Xi'an China