CHINA SCOTON OILFIELD EQUIPMENT CO., LTD.

Storage Tools Break Through Mechanical Barriers

Quartzdyne recently launched Quartz and Piezo, two storage measurement tools. These tools are able to break through mechanical obstacles, and they are robust and accurate. In addition to monitoring high temperature and high-pressure environment, the storage tool can also detect the interference in the well. The tool is applicable to multiple applications in oil fields, such as drill pipe testing, wire work, interference test, durability test and overall yield optimization. The tool has the feature of welding ring closed, the side of the metal to metal seal, convenient port access points, with diaphragm protection of quartz sensor, 5.5 million data sets, and 100% mixed MCM electronic equipment. These features make the tool easy to use, and a vendor can provide its full range of services and support.
Related Article
  • Automated drilling

    Automated drilling

    March 29, 2021Automated drilling is one of the oil industry’s most important innovation targets.The sources now being tapped, such as shale gas and coal-bed methane, require a very large number of wells, and autom...view
  • Introduction of Q250 Pneumatic Spinning Wrench

    Introduction of Q250 Pneumatic Spinning Wrench

    April 29, 2018Q250 Pneumatic spinningwrench is a pneumatic roller type spinner used in marine and drillingmechanization industry, with a range of 3 1/2-10 (in) drill rods and drillcollars. In the drilling operation...view
  • The RAR Technology Provides a New Function for the Disconnectable Mooring System

    The RAR Technology Provides a New Function for the Disconnectable Mooring System

    September 22, 2017Delmar recently launched a new RAR Plus and move-max deliverable mooring system. The RAR Plus technology adds new key features to the 35-year old RAR technology, such as manual release, and it raises ...view
  • Dual Well Completion Principle

    Dual Well Completion Principle

    April 29, 2018After the oil wellpenetrating through the oil layer and the bottom water layer, the well completionsare implemented in oil and water layer, and the two layers were seperated by apacker. When the well ...view
  • The New Hose Connector Reduces the Stress of the Hose

    The New Hose Connector Reduces the Stress of the Hose

    September 22, 2017KLAW recently launched Marine2, which is 32 percent shorter and 25 percent lighter than the traditional offshore pulled joint. The design is designed to reduce the stress on the hose at sea. The short...view
  • Technical measures for casing cementing operation

    Technical measures for casing cementing operation

    March 6, 2025According to formation characteristics, reservoir characteristics, cementing technology and quality requirements of cementing, scientifically and reasonably prepare cementing construction design.view
  • TEL:+86-029-81138812
  • FAX:+86-029-62827812
  • EMAIL:sales@scotonpetro.com
  • ADDRESS:Hi-Tech Development zone, Xi'an China