CHINA SCOTON OILFIELD EQUIPMENT CO., LTD.

The Wellsite Monitoring Programme Supports Data Analysis and Management

The Dover Energy Automation and MOBOTIX AG have cooperated to develop a comprehensive well network monitoring program. This combination integrates the smart camera suite of MOBOTIX with the artificial lift optimization software platform of Dover Energy Automation's XSPOC. The xVision module in the XSPOC software of Dover Energy Automation integrates the audio and video feedback and detection functions in the MOBOTIX intelligent IP camera series. This scheme has some extensibility, which can realize the analysis application and efficient data management. In addition, it also provides intelligent 3D motion detection, low bandwidth, high quality image and other functions, it can help the production optimizer to achieve higher level of well - field risk awareness, reduce reaction time and rationalize the response to the well incident.
Related Article
  • Usage & Operation of Safety Joints

    Usage & Operation of Safety Joints

    April 29, 2018(I) Drill stringassemblySafetyjoint installs on the tubing string and operates for drilling, salvaging, wellcleaning, repairing and testing, etc. Its diameter and diameter of the bit portshould be th...view
  • The New Hose Connector Reduces the Stress of the Hose

    The New Hose Connector Reduces the Stress of the Hose

    September 22, 2017KLAW recently launched Marine2, which is 32 percent shorter and 25 percent lighter than the traditional offshore pulled joint. The design is designed to reduce the stress on the hose at sea. The short...view
  • Storage Tools Break Through Mechanical Barriers

    Storage Tools Break Through Mechanical Barriers

    September 22, 2017Quartzdyne recently launched Quartz and Piezo, two storage measurement tools. These tools are able to break through mechanical obstacles, and they are robust and accurate. In addition to monitoring hi...view
  • The Launch of New Production Optimization Platform

    The Launch of New Production Optimization Platform

    September 22, 2017Weatherford International released the ForeSite production optimization platform at its software conference. The new platform combines physical model and advanced data analysis to comprehensively impr...view
  • Dual Well Completion Principle

    Dual Well Completion Principle

    April 29, 2018After the oil wellpenetrating through the oil layer and the bottom water layer, the well completionsare implemented in oil and water layer, and the two layers were seperated by apacker. When the well ...view
  • Maintenance of Mud Pump

    Maintenance of Mud Pump

    April 27, 20181. The mud pump must be installed on a relatively stable foundation. Before operation, carefully check the lubrication condition, fastening condition, and fit clearances between various parts of the ...view
  • TEL:+86-029-81138812
  • FAX:+86-029-62827812
  • EMAIL:sales@scotonpetro.com
  • ADDRESS:Hi-Tech Development zone, Xi'an China